Réunion Tram Train
The Réunion Tram Train (French: Tram-train de la Réunion) is a planned tram-train line to run approximately 140 kilometres along the coast of Réunion.[1] Construction of the first phase was scheduled to start in 2010, for opening in 2013.[2][3] The Tram'Tiss consortium is preferred bidder for a PPP concession to develop the line.[3] However, the project was abandoned in May 2010 due to a lack of funds.
History
Reunion used to have a rail system opened in the 1890s and closed in the 1950s and 1960s when population and traffic congestion were less.[4]
Overview
The line will operate as a hybrid of a tram and a train, with tram-like street-level stations in the towns and train-like speeds of up to 100 km/h on dedicated right of way between them. Trains would be capable of carrying up to 250 passengers; the route would also be capable of carrying freight from the port.
From west to north, the projected route of the first phase (41.5 km, 26 stations) will start from St-Paul and pass through St-Denis, terminating at Roland Garros Airport in Ste-Marie. The mountainous topography of Réunion will necessitate a large number of viaducts and tunnels: the first phase includes 11 major engineering structures, including a 10-kilometre tunnel and the highest railway bridge in the world. The cost is estimated to be €1.25 billion for the first phase alone. Extensions east to St-Benoît and south to St-Joseph are envisioned.[1][3]
See also
References
External links